
Description of our 600BPH 5 gallon filling line
SOMETHING NEED TO CONSIDER
WHEN CHOOSING A SUITABLE MACHINE
How to find a suitable Gallon water production equipment?
1. Do you need additional spare parts for vulnerable parts?
2. Are there any brand or other requirements for the electrical
parts of the machine?
3. Does the gallon filler(more than 300 bottles) require special
matching machines, such as bottle bag packing machine or gallon
palletizer?
hot alkaline water washing Gallon water production
equipmen/line/device with bottle holder | ||
Items | Name of machine | Model |
1.1 | Automatic De-capper | CR-1 |
1.2 | Brush Internal-External Bottle Washer | WS-1 |
1.3 | Washer/Filler/Capper with auto bottle loading | WFC-600BPH |
1.4 | Heat Shrinking Machine | ZSM-1 |
1.5 | Checking Light | CL-1 |
1.6 | Conveyor Belt with Motor | / |
Details of Gallon water production equipment:
1, Automatic De-capper
2, Brush Internal-External Bottle Washer
3, Washer/Filler/Capper with auto bottle loading
4, Heat Shrinking Machine
Our transaction level:
Our products sell well all over the world, we are exported to
southeast Asia, the Middle East, Europe and the United States, such
as UK, Italy, Russia,Chile,Jamaica,Kenya, Malaysia ,Sri lanka,and
other countries and regions in the world...
Once you want to begin the bussiness ,FILL-PACK company can provide
turn-key project for you.
3 / 5 gallon / 20L bottle water manufacturing equipment / plant /
machine / system / line
FAQ
1. Why do you choose our factory?
There are many foreign guests cooperate with our company.We have
enough experience and fund to provide you the high-quality products
with the best price.
2. How long can you delivery?
About 30 days after we received the deposit(30%T/T in
advance,70%T/T before shipment.)
3. How about your after-sale service?
One year repair for free Seller responsible for arrange engineer
for installation and guide the workers of buyer how to operate and
necessary repair,and give buyer a turnkey project.
4. How long can you finished the installation?
About 10-15 days.If the water and electricity is ready.If you have
any questions,please do not hasitate to contact me.
Zhangjiagang City FILL-PACK Machinery Co., Ltd
ZhangJiaGang City FILL-PACK Machinery Co.,Ltd. which was originally set up as an factory in 1999,the company is growing up time by time in research and design, quality and production, sales and after sale service. Our machineries are sold to more than 50 countries in the world and over cross domestic.
We specialize in producing beverage filling-packing equipments and water treatment equipments. The quality already pass drinkable standard.At present we produce: production lines for mineral water, pure water, fruit juice,tea drink,milk drink and carbonated drink with capacity 1000-20000bottles/hour; production lines for vinegar, soy sauce and wine 1000-20000bottles/hour; 3-5 gallon barreled water with capacity 60-1200 barrels per hour and water treatment plants 1-30 ton/hour; We provide separate machinery or turnkey project.
Our products pass quality inspection executed by Bureau of Quality and Technical Supervision every year. We pass Italy CE inspection in 2011;
We have full-time development and design engineer team, we absorb technologies from Germany, Japan, France, Italy, Switzerland, combined with China's national conditions to develop high starting point and advanced technology filling equipments, degree of automation to achieve the advanced level.
We own 3700 square meters modern factory in accordance with ISO9001: 2000 certification system standards with all kinds of advanced processing equipment and testing equipment, experienced technicians, scientific and strict management, all constitute FILLPACK excellence in product manufacturing system, which provides the strongest protection for FILLPACK product quality.
We believe in FILLPACK’ s future while you choose us!